Newtownards — Northern Ireland
Solar for Ards — from town semis to peninsula farms.
Newtownards sits where suburban solar meets rural three-phase — and we work both sides of that line every week, from Movilla estates to smallholdings down the peninsula road.
Local knowledge
How we work in Newtownards.
In town, semis and detached homes around Bangor Road and Movilla carry straightforward, productive roofs — quick installs, clean payback. Out the peninsula and towards Comber, properties change character: bigger plots, outbuildings, three-phase supplies and higher base loads. That's where our agricultural and rural experience earns its keep — shed roofs put to work, ground mounts where the house roof faces wrong, and G99 grid applications to NIE Networks handled without drama.
The Ards climate is kind to solar — coastal light without the harshest salt exposure — but we still spec fixings and isolators for the conditions. Battery storage matters here too: rural ends of the network see more than their share of outages, and a battery with backup keeps well pumps, freezers and heating controls alive while the street waits for reconnection.

What we install
Every service, available in Newtownards.

Solar panels
Designed for your roof, installed in a day or two, certified by NICEIC electricians.

Battery storage
Hinen, Sigenergy and EcoFlow systems that bank daylight for the evening.

EV charging
OZEV-approved home charge points, solar-aware where it makes sense.

Backup power
Whole-home or essentials backup that rides through outages.

Commercial solar
Rooftop systems for offices, shops and industrial units — designed on real consumption data.

Commercial EV charging
Workplace bays with billing, load management and the grant paperwork handled.
Do you cover the Ards Peninsula?
All of it — Greyabbey, Kircubbin, Portaferry and everywhere between. Rural and farm properties are a speciality, three-phase included.
Can a farm or smallholding near Newtownards get solar?
Yes — shed roofs are often the best generating asset on the property. We meter your actual usage, design around it, and handle the G99 application to NIE Networks.
Is Comber covered too?
Yes — Comber, Killinchy and the Strangford shore are regular territory for our teams.
Can you add circuits to a farm shed near Newtownards?
Yes — three-phase shed and outbuilding work is routine here: new distribution boards, socket and lighting circuits, and certification that stands up to inspection.
Ready when Newtownards is.
Free survey, honest numbers, NICEIC certification — and 0% VAT on solar and batteries until 31 March 2027.