A workplace charger quote needs to answer three questions: who will use the bays, how much charging they need during a normal visit, and what the building's electricity supply can support. Those answers determine the equipment, cable routes and operating costs.
Glow Electric designs and installs commercial EV charging in Belfast and across Northern Ireland. We are an OZEV-approved installer and NICEIC Approved Contractor. A site survey establishes the scope before we give you a written quote.
Start with staff, fleet or visitor charging
Staff cars parked for a working day have a different charging pattern from vans returning between jobs or visitors staying briefly. List the vehicles expected now, the time they will spend on site and any expansion already planned. Charger speed alone does not tell you whether a system will meet that demand.
Decide whether the bays are private, shared or publicly accessible. That affects access control, billing and grant eligibility. It is better to settle those choices before ordering equipment than to discover afterwards that the chosen system cannot support your charging policy.
What the site survey needs to cover
- Supply capacity: existing electrical demand and the additional load from simultaneous charging.
- Cable routes: distance from the supply, trenching, wall penetrations and reinstatement.
- Bay layout: vehicle access, cable reach and protection of the equipment.
- Connectivity: the connection needed for management, billing and remote support.
- Future bays: whether it makes sense to provide ducting during the initial groundworks.
Load management can share the available power between chargers, but it is not a promise that every site can avoid a supply upgrade. We assess the options and the relevant NIE Networks connection requirements before agreeing the design.
What does workplace EV charging cost?
We price commercial installations after a survey. A home charger starting price is not a reliable budget for a business car park: groundworks, multiple bays, distribution equipment, network work and billing requirements can change the scope considerably.
Ask for the quote to distinguish equipment and installation from any ongoing software, connectivity, payment-processing or maintenance charges. Decide who pays for the electricity and how usage will be recorded. If you want an expansion option, have it priced separately so you can compare installing it now with returning later.
Request a workplace charging survey with your site address, intended users and approximate number of bays. We can then work from a useful brief.
Workplace Charging Scheme: check eligibility first
The Workplace Charging Scheme currently contributes up to 75% of eligible costs, capped at £500 per socket and 40 sockets across an applicant's sites. Funding is confirmed until 31 March 2027. It is not an automatic £500 discount on every charger or a separate allocation for each car park.
Business staff/fleet bays and public customer charging have different eligibility conditions. Check the official scheme for your organisation and intended use before budgeting for support. The Northern Ireland EV grants guide also explains the separate household, landlord and education routes.
The applicant obtains the voucher; the authorised installer claims after the work. Installation and claim must be completed within the voucher's 180-day validity. Agree a realistic programme before applying.
Do not budget for the old staff-and-fleets infrastructure grant or commercial landlord chargepoint grant: both closed to new applications on 31 March 2026. Ducting future bays can still be sensible, but the cost needs to be included in the quote.
Permissions and Northern Ireland requirements
Confirm ownership or landlord consent, site-specific planning requirements and the network connection route. These are separate from grant approval. The installation needs suitable electrical design, protection, testing and certification.
The Electric Vehicles (Smart Charge Points) Regulations 2021 apply to private chargepoints sold for use in Great Britain; the guidance expressly excludes those sold in Northern Ireland. Smart scheduling and load management can still be useful features here, but that legislation should not be presented as a blanket NI requirement.
If the chargers will be available to the public, check the Public Chargepoint Regulations guidance for the responsibilities that apply to your operation. Public access needs to be part of the design brief, not an afterthought.
Handover and ongoing operation
Agree who will manage user access, tariffs and fault reports. At handover, keep the certification and equipment information, confirm the support arrangements and check that the people operating the site know how to use the system. Include any ongoing charges and maintenance scope in that discussion.
If the premises also have a suitable roof, commercial solar may complement daytime charging. Assess generation and vehicle demand together; do not assume solar will cover charging at every hour or in every season.
Reviewed 18 October 2026. Grant amounts and deadlines above were checked against the linked government guidance. We confirm eligibility and site requirements at quote stage.
Questions customers ask
Can we claim £500 for every workplace charger?
Not automatically. The WCS contribution is limited by eligible costs, the per-socket cap, your remaining allocation and the scheme conditions. Check eligibility before assuming a grant in your budget.
Does load management guarantee we will not need a supply upgrade?
No. It can share available capacity between chargers, but the site supply, existing demand and charging requirements determine whether an upgrade is needed.
Can we include solar in a workplace charging proposal?
Yes. We can assess commercial solar alongside charging. The design should compare daytime generation with vehicle charging demand rather than assume all charging will run on solar.